Material Transition

Public Material Flow Library / Antony Waste Handling Cell Limited

Company material-flow brief · Evidence checked 20 September 2026

Antony Waste: separate recovered plastics from WtE output

Antony Waste Handling Cell Limited · Indian municipal waste processing

Antony Waste’s evidence-backed material lane sits inside municipal solid-waste processing, not in an assumed ash-recovery market. In its FY2024 to 25 integrated report, the company said it managed 4.93 million metric tonnes across its portfolio. It also reported that the Pimpri-Chinchwad waste-to-energy facility completed its first full commercial year, averaged an 82% plant-load factor and delivered more than 90 million green units to the grid. Separately, the company said the PCMC project was registered to qualify for EPR credits through its plastic-processing operations. These are distinct flows: waste managed, electricity generated and plastic processed for the EPR program. None establishes a named polymer grade, recovered-plastic volume, ash composition or open product supply. A useful materials conversation should start with the PCMC sorting and plastic-processing boundary, request the recovered polymer and contamination profile, and establish whether the EPR feedstock and any resulting material are controlled by Antony, the municipal client or a project subsidiary. The firm’s newer 2026 site metrics are cumulative and dated to June 2026; they should not be mixed with FY2025 annual figures.

FY2025 portfolio throughput has a clear reporting period

The integrated annual report says Antony’s group managed 4.93 million metric tonnes of waste in FY2024 to 25 across collection and transportation and processing. This is a group portfolio throughput figure, not recovered-material tonnage, a single-site input figure or saleable inventory. Keep the reporting year and company boundary attached whenever using it.

PCMC combines power generation and plastic processing

The company reports that its Pimpri-Chinchwad WtE plant completed its first full commercial year, averaging an 82% plant-load factor and delivering over 90 million green units to the grid. The annual report separately says the PCMC project registered for EPR credits through plastic-processing operations. Electricity output and EPR-registered processing do not disclose polymer output, quality or ownership; these need a facility-level balance.

Do not infer a commodity from the incinerator residue

The public material reviewed does not provide a current PCMC ash assay, recovery yield, beneficial-use approval or contracted buyer. Ash recovery is therefore not presented as an established Antony product lane. It remains a diligence question, alongside the documented but unquantified plastic-processing stream.

Evidence register

Sources and claim boundaries

Antony Waste Integrated Annual Report 2024 to 25

Company annual report reports 4.93 million metric tonnes managed across the portfolio, PCMC’s first full year, 82% PLF, over 90 million green units and EPR registration through plastic processing. These are distinct metrics and flows.

Open source ↗

Antony Waste waste-to-energy project overview

Official company page describes the PCMC project as 1,000 tonnes/day input design and 14 MW, and says it uses recycled water. Design capacity is not actual throughput. The annual report is used for FY2025 operating evidence.

Open source ↗

Antony Waste operational highlights as of June 2026

Official homepage labels its scale figures as of June 2026 and distinguishes cumulative waste processed since project inception from annual handling. These later cumulative measures are intentionally not combined with FY2025 group throughput.

Open source ↗